Well, what do you know - again a change to the trackwork.
As suggested by Anthony on a recent visit to make the main loop track at Ingle longer and to use a curved point at the west end. Spent the morning (beginning at 0530am when it was nice and cool and bright) relaying this section of track - alot of hard work, drilling, cutting track, soldering, going through the steps multiple times to get it right.
I think, its better to have a longer loop track rather than a head shunt at both sides.
Now, I will get 8 of the ANE model point servos so I can press a button and simulate a signal man at this station.
Here is a photo:

Followed by some signal pics:


