Here is a plan that includes multiple levels.
It consist of three levels, with staging on either side. It's not continuous run I know, however the nature of the long main-line run may be enough to see some action. It has a station and its a through run rather than a terminus. I can shunt and make up trains at either staging end (active staging) - with the idea being that this will be where operators will be placed to make up and break up trains during op sessions. The emphasis is on these areas rather than at the main station area.
It consist of three levels, with staging on either side. It's not continuous run I know, however the nature of the long main-line run may be enough to see some action. It has a station and its a through run rather than a terminus. I can shunt and make up trains at either staging end (active staging) - with the idea being that this will be where operators will be placed to make up and break up trains during op sessions. The emphasis is on these areas rather than at the main station area.
