Had quite a constructive week.
Power-routed another set of points, this one the approach to the main station.
Fixed my blown bi-coloured LED. This was really frustrating. After installing, testing revealed only one colour was working. Had to un-solder and wire up another LED and during this time, the search light head came off as I tried to place the LED into the head! It's time like these I think is this all really worth it. Utter frustration. Soldered another LED and all was good. So far the most challenging has been the signalling on the layout
I now have all my signals up and connected to a detection circuit. The only one remaining is the approach from the east. This will require two signal circuits created, one for the low-speed and one for the main head.
Was a very wet week. One side of the layout faces the shed's roller door, and this section is open to the elements. Gave some thought on how best to fill this gap. Eventually settled on 3mm MDF covered with 1mm sheet. This should stop the MDF from getting wet, but I am not sure how well the 1mm sheeting will stand up to the hot summer sun which rises from this side.
I am rethinking the Flour siding, looks to cramped for my liking. Most likey I will do away with it and have a dock road to shunt the Perishables siding. I had to be honest to myself and although I would like to have another industry here, it just doesn't look right. This leaves me with three shunt areas if I include the sidings, and three shunt areas at the minor location. The minor location is worked by the pilot from the major location.
Power-routed another set of points, this one the approach to the main station.
Fixed my blown bi-coloured LED. This was really frustrating. After installing, testing revealed only one colour was working. Had to un-solder and wire up another LED and during this time, the search light head came off as I tried to place the LED into the head! It's time like these I think is this all really worth it. Utter frustration. Soldered another LED and all was good. So far the most challenging has been the signalling on the layout
I now have all my signals up and connected to a detection circuit. The only one remaining is the approach from the east. This will require two signal circuits created, one for the low-speed and one for the main head.
Was a very wet week. One side of the layout faces the shed's roller door, and this section is open to the elements. Gave some thought on how best to fill this gap. Eventually settled on 3mm MDF covered with 1mm sheet. This should stop the MDF from getting wet, but I am not sure how well the 1mm sheeting will stand up to the hot summer sun which rises from this side.
wet week - source: bom.gov.au
I am rethinking the Flour siding, looks to cramped for my liking. Most likey I will do away with it and have a dock road to shunt the Perishables siding. I had to be honest to myself and although I would like to have another industry here, it just doesn't look right. This leaves me with three shunt areas if I include the sidings, and three shunt areas at the minor location. The minor location is worked by the pilot from the major location.