Sunday, October 16, 2011
UTP Panels Deployed
Installation of two UTP Panels on the layout. One is at the Locomotive Depot, and the other new installation is at one end of the yard. This gives me the required flexibility to walk round as needed. The picture shows the new UTP panel installed at the yard.
Subscribe to:
Posts (Atom)