Visitors

Flag Counter

Monday, November 25, 2019

Sequential Operation

Previously I commented on how I was operating my layout and although that was fun, it got me thinking what if I ran one movement from staging, through the station, then back to staging - basically operating the continuous layout in a point-to-point fashion.

So, lately, after work I have now been running one movement just like this and it really does feel alot more realistic and prototypical.  I have 19 movements to complete and on two occasions, there is either a meet or cross.     All trains have to stop at the station for a crew change.  This makes the operating session stretch out little. 

Every evening, I may run maybe 3 or 4 movements which takes about 30 mins, then do some odd job in the shed and then close off for the day.  Very relaxing!

I currently have five staging tracks, so I had to create a shelve to cater for the extra wagons and rolling-stock which is near the staging/fiddle tracks.

The following is the list of movements

-->
1DNJET
2UPTHROUGH
3DN THROUGH
4UP GOODS
5DNPAPERCROSS with 6
6UPJETCROSS with 5
7UP RM
8DNGOODSWait for 9
9DNGRAINRoad 1
10DNRM
11UP CATTLE
12UPLE
13UPSUPERPHOSPHATE
14UPBONO
15DNCATTLE
16DNFAST GOODS
17DN SUPER
18UPFAST
19DNBONO

Here are some photos from the ops:









Sunday, November 10, 2019

Scenery Bug

Spent some time working on the scenery since I have neglected this area of the hobby for some time.
After visiting Geoff's place and seeing his layout, I was inspired to spruce up some areas of the layout.  I tried my hand at making some bushes and also tried to bring up my standard on some of the trees I made.  I noticed that I needed some variety. 

Still a good working in progress and a long learning curve.  Unfortunately I don't seem to have the nack for scenery when compared to other folks out there.











Followers

Blog Archive