Visitors

Flag Counter

Monday, December 12, 2016

On Reflection...



On reflection, the session I had with Craig actually highlighted a few drawbacks with the Metropolitan theme and as such, I have abandoned that idea.  So it was back to thinking of what I could do with the layout I have now built.  At this point previously I would go about ripping up the layout and starting again.  However, I looked back and remembered the sessions I had with Anthony and looking back at my notes on why I had ripped up previous layouts, I had commented on the 'Dinboola" plan that staging was too short and  there was no long main line run.

Well, I thought, now I have these two short-comings rectified, why don't I go out and run the session again. I had kept the timetable in a plastic sleeve folder and begin with the first movement - a Light Engine from Serviceton to "Dinboola".  Two hours later and I couldn't bring myself out of the shed!  I was so engaged with the varied movements, and the mainline run with the odd shunting - I was having a ball!

I even found space for a turntable and a few roads.  Now, since I have staging on the lower deck, which is the longer run from top to bottom.  This is the run from "Dinboola" to Serviceton, with the much shorter run going the other way to Ararat.

So far this theme seems to be what I enjoy most so hope to stick to this concept.








Sunday, November 27, 2016

This Afternoon



This afternoon, Craig joined me in running the sequence of events that constituted the operating session I had posted the previous time.

This part will look at the morning interstate freight arriving into the yard.  Then the yard pilot will make up a train consisting of the empty VLXs which will be shunted on a pilot run to Sadliers.

Initial view of yard before operating session begins


Below photo shows the oil pots at Shell which are currently being loaded and will be picked up later in the session.


Below we see the Pilot arrive at the yard for duties with the interstate goods from Adelaide arriving on road 3.


The Yard Pilot is ready to break up the train.

Below we see the first wagon to come off is the Guards van and the VLXs behind will be placed in front of the Van before proceeding to Sadliers to be loaded for the afternoon interstate run back to Adelaide.

The below shots shows the Van coming off and will be shuffled and placed at the rear of the VLXs.



A trip down the main line and we arrive at Sadliers for the shunt of the empties.  


Below we see the shunt into Sadlier take place with the Van on the Main road whilst shunting the empties back into Sadliers to be loaded.  The Y will need to hook up onto the van and bring it into road 2 then run around it.  Then it will proceed back to the yard.   


In the next blog post, we return to the yard, where the session will continue as per the sequence outlined in the previous post.

Monday, November 21, 2016

Thoughts on a Shunting Session

Below is a depiction of the layout with some industries which can be shunted on local Pilot jobs. In real life, these pilots would leave from Tottenham Yard in Western Melbourne and shunt some of the industries. Tottenham Yard was huge and many trains would terminate and be made up there.  It was only 1 station away from where I used to live in Sunshine, Victoria.

Anyway, last Sunday I was fully immersed and quite enjoyed executing the session outlined below.
The trains are obviously made up but it doesn't really deviate that much from what happened in real life, obviously all happened on a much larger scale.

Now before I start any scenery I need to make the decision - do I model the country or do I go for an industrial layout.  Both have their positives and minuses.

Below is what I executed on Sunday which took about 2.5 to 3 hours to complete.  I would like to get a couple of chaps over to execute the session to see what they think and get some feedback.  Craig, Darren, Geoff, Anthony and Mark are good candidates!

Two, possibly three operators - each outlined with the colour code below (Pilot Working and Shunt could be combined)


  1. Freighter arrives this morning - Road 3 (Longest Road)
  2. VLXs come off and go to Sadliers
  3. Whence Return - Road 4 or Road 5 holds train for Geelong, hence empty JXs from (1) come off to be placed for Geelong Loading
  4. From Road 4 or Road 5,  shunt off ELX (later to be used for Arc Eng) and place in spare road  - Geelong Goods departs
  5. Grain or Jet
  6. Ex staging, from Geelong with JXs in consist - arr. Road 4 - Loaded JXs to be shunted on evening freighter, other JX to be shunted to Boral with ELX as Pilot (step 7)
  7. Trip train to Boral and ARC Eng.
  8. Whence return Arrival from North - onto Road 2 - Any TWs to be off-loaded - split train keeping road 2 free.
  9. Arrival from South - onto Road 2- Any TWs to be off loaded - keep Road 2 free - utilise stub-ended sidings.
  10. Pilot to work Caltex with empties TWs from (8) and (9) - Need to take wagon to place in between Engine and Tank car- Bring back Sadliers and Loaded TWs
  11. Whence return, make up Northbound goods with TW/s in loading then departs
  12. Sadliers loading to be on Express Freighter then departs
  13. Other TWs to be loaded on Southbound Goods then departs


Depicts Main Line Run
Depicts Pilot Working

Depicts Shunting

The following shows the schematic of the layout.





Tuesday, October 4, 2016

Got there at Last.


Well I am pretty happy with the track plan and layout as it currently is.  I got there at last!  It was a long journey.  How many times I built up and ripped up the layout, never satisifed or happy with what I had achieved.

Another modification I made last month was to move staging to now be behind and near the side wall rather than the front.  I thought why waste such a large area with a generous curve to staging and instead make this area a smallish town with its appropriately sized yard and station area such as Buangor in Western Victoria.  The added benefit with this is that I have another crossing loop which takes the number of loops to two.  The loss is the smaller alise space near the side wall - that will keep me motiviated to keep an eye on the waist line!

I still have the "main" town with shunting opportunities however since I have had this layout, I have simply enjoyed seeing trains run and crossing them and haven't really been inclined to shunt at all!
As I told you in an earlier post, this layout gives me a nice main line run.  I can even have distant / automatice signals at an accepatable range between the crossing loops and station areas.  It also gives me the enjoyment of different viewpoints and angles on the subject from dead straight on to 45Degrees to concave and convex.  This is a major departure from that straight side-on viewpoint I use to have.

Now I can work on this layout adding the extra details such as the station buildings, houses, track weathering, scenery etc, etc rather than rip up and rebuild yet another layout.
Some shots show the changes that were made during last month.

Above: Initially this was going to be staging

But staging now moved to the side/back - A waist check will be performed before entry to this area -  better watch the waist line! 

Below: Goods Shed moved to make way for a couple of industries shown lower.

Before we had staging :


and now with staging:


Some industries - still seems little too crowded?

Below: Branch Line on the right - forms the upper loop to watch them roll round:



Below: Former staging area now and previously:

Foam added to get away from that plywood flat look - playing with the idea
Below: previously staging here.


Wednesday, August 10, 2016


Status Update

I have been quite busy tweaking the layout.  Originally I had a duck under which got me into the loop of track and staging was under the benchwork.  I also wanted to have an island layout where I could walk-around it so I had to bring one part of the layout away from the walls.  This change had me thinking of where to put staging as the idea of having staging under the benchwork proved to be an unwise choice as it was just too difficult to get to the inner tracks.  I had to re-think the current design and eventually decided to place staging at the front of the layout.  This is at 900mm height and began a climb to complete the loop and to join the rest of the layout at the upper level.  However I then had wagons rolling away and the gradient to get to the upper level was just too great.  Again I had to rethink the design.  I abondened trying to complete the loop from the lower level and now the layout is a simple point to point one with the upper level forming a continuous loop for when I just like to watch trains roll by.

I also divided the back of the layout having two scenes, one shows the line leaving staging at the bottom and climbing up and the scene behind it is part of the towns' industries mainly a siding for grain and one for VLX wagons at this stage.  I also wanted to try and stick with the prototype and not have industries coming off the main and being able to operate outside of the convex allows easy reach to shunt industries near the edge of the layout.  Having no industries to foul the main allows trains to run unimpeded in the loop.  The things I had to give up for this plan was the continuous run from staging and then back to staging and the possibility of having crosses and passes.  However having a train pull in and then shunt the industries for the next 30 or so minutes is enough to keep me engaged of an evening.

Some photos of the layout.
















Monday, May 2, 2016

Visit to Darren's Place

Yesterday a group of us had the pleasure of visiting Darren's place to see the updates on his layout.  All I can say is that his modelling work is just incredible!  The part of the layout he has worked on looks absolutely beautiful and it's just a pleasure to look it.  He has some real talent!  The non-scenic and scenic parts are like night and day!  His layout is going to be a ripper when its done and will be a pleasure to operate on or to just walk round and admire.

I took a passenger from the branch to the mainline and back again.  Initially a steamer was on the pointy end, but being typical of a steam engine, one of the wheels fell off ! ( I think it was a 32 class) and a more reliable form of power was called for (diesel off course!)



Here is some footage, which unfortunately does not do any justice to Darren's modelling work.




Drop Cows





Followers

Blog Archive