Monday, January 2, 2012
Small Goods Arrives
Here is a video showing a small goods train coming into the yard and terminating. The wagons will then be shunted either to the respective destination tracks or on the yard tracks as empties for temporary storage. The loco is then seen heading to the depot.
Friday, December 30, 2011
Taking Stock
Last few days I have fine tuned the shunting process and hence made it some what more prototypical. Initially the yard tracks were left empty, now I have wagons on the yard tracks which could be left there for some time, just like the prototype.
Monday, December 26, 2011
Point Activation using Dowels and Eye Screws
The last two days time was spent working on activating the points which lead to the departure tracks using the dowel method shown to me by another VR modeler. The procedure requires 6mm dowel from Bunnings, piano wire about 1mm thick, some eye screws - get the bronze ones if your layout is outdoors like in a shed/garage, and your basic tools such as power drill, drill bits, wire cutter, and junior saw / hack saw.
See attached photos on how I did this. The major benefits are that it is very cheap compared to a servo or tortoise machine and it works really well.
Not shown in the photos are the steps where I drilled a 1mm hole into the dowel then aligned the point and threaded the piano wire through the point and dowel. This was the most difficult part.
Bye now.
Bye now.
Monday, December 5, 2011
Something for the NSWGR modeller
Here we see a former NSWGR 421 class demoted to shunting duties at Acacia Ridge, Brisbane.
She definitely sounds like a Victorian Railways S Class diesel loco.
Cheers
Sunday, November 6, 2011
Video of former Victorian Railways X Class Locomotive
I was delighted to photograph a former Victorian Railways X Class which was part of a consist assigned to head a Melbourne bound freighter on Saturday 05 November. I was extremely lucky to get some footage and just to see a X class leading through the viewfinder brought back vivid flash backs to my younger years photographing. Hope you enjoy the footage.
Sunday, October 16, 2011
UTP Panels Deployed
Installation of two UTP Panels on the layout. One is at the Locomotive Depot, and the other new installation is at one end of the yard. This gives me the required flexibility to walk round as needed. The picture shows the new UTP panel installed at the yard.
Sunday, September 18, 2011
Shunting continues
One of the side benefits of a shunting layout is the interesting consists that can randomly occur during shunting. Here is a photo of Y164 with three ZLP Guards Vans which will be shunted back onto the departure tracks. Something like this is not seen often on layouts. The other photo displays the three departure tracks where loading is set back on to.
Subscribe to:
Posts (Atom)

