Over the last two weeks I took up the challenge to build a turnout.  Well after much perseverance I am quite happy with the result.
I made a few errors.  The stock rails are little too short and the first frog I made disintegrated and came apart during a soldering job, so I had to basically rebuild the frog.
I used about 1 mm for the flange-ways and tried to keep close to the AMRA fine tolerance standard.  I noticed that the wheels on the wagons and locos also need to be precise, so will need to look at each of the wheel-sets at a later time.
The sense of accomplishment seeing a few trains run through the point that I just built was all worth the frustration at the end.  There were many times when I was about to throw in the towel!  I will use this point in the yard somewhere.
I made a few sleepers using paddle-pop sticks and tried to keep to the VR profile as much as possible.
One advantage of creating your own is the spacing of the dead frog.  Since I was able to reduce this area by about 3cms (on the PECO large points, this distance is about 10cm), my short wheel loco, the Y class, happily moves through this area without any pauses with both frog rails isolated. I still need to trim down the PCB sleepers and paint the sleepers.  I am now keen to make another one.
I need to work out how to secure the point rails.  One of the nice things about the PECO points are the spring-loaded mechs.  Any ideas would be appreciated.

Here are some photos.

Tracing an original point and I used this as a template.
This idea was created by DKRickman and used from this site






I used super-glue to fix the sleepers to the rails

Nearly completed point.


2 comments:

  1. Shelton, great work! I've used the Modratec system for holding over my points and once set up I've not had any issue at all. I've got a few point blades made so ill bring them along on Tuesday

    ReplyDelete
  2. Thanks Geoff - I have now come to the realisation of the real meaning of the "model" part of model railways! Slow learner I know.