The following changes made since last post.
Due to the lack of main-line run, I have done away with the concept of staging, using the good old 0-5-0 instead.
One side of the layout will be a smallish yard with some shunting possibilities, the other, a small outback town with two roads, one being the main and the other servicing a goods shed, a silo and a cattle siding (for example Gerang Gerung (photo))
I usually run one train at a time. This train will run a few laps until I am content, then it can do a number of things:
1. Shunts at the small town
2. Shunts at the larger town
3. Crosses another train at the larger town or
4. Goes directly "off line"
All locos and wagons are stored away so every time I want to run a train, I basically make up a consist on the fly. One thing good about this is that I can have many consists programmed into the controller and don't have to worry about killing a consists after a run. The down side is that there is much more handling of the rolling-stock. Removing and adding a new train takes under a minute so its quite easy. For the precious space that I have got back by not using staging, which is basically nearly 6 metres, it is of little trouble to me to manually stage trains.
Due to the lack of main-line run, I have done away with the concept of staging, using the good old 0-5-0 instead.
One side of the layout will be a smallish yard with some shunting possibilities, the other, a small outback town with two roads, one being the main and the other servicing a goods shed, a silo and a cattle siding (for example Gerang Gerung (photo))
I usually run one train at a time. This train will run a few laps until I am content, then it can do a number of things:
1. Shunts at the small town
2. Shunts at the larger town
3. Crosses another train at the larger town or
4. Goes directly "off line"
All locos and wagons are stored away so every time I want to run a train, I basically make up a consist on the fly. One thing good about this is that I can have many consists programmed into the controller and don't have to worry about killing a consists after a run. The down side is that there is much more handling of the rolling-stock. Removing and adding a new train takes under a minute so its quite easy. For the precious space that I have got back by not using staging, which is basically nearly 6 metres, it is of little trouble to me to manually stage trains.