Here is a track plan that I have been working on. I couldn't be bothered using some nice track planning drawing tool so I did this using MyPaint on Linux. Apologies in advance.
Each Letter represents the following.
A. Staging - Active staging where Pilots are made up. Gives some extra shunting movements. Likely to also include some locomotive stabling tracks and maybe an extra stub ended siding for wagons. which will be at location B. Best use of this space?
C. Industry: Currently Flour Mill
D. Head Shut
E. Industry: Currently Arc Engineering (Steel products In)
F. Industry: Currently Caltex
G. East Staging. Not sure what to do here, may be I will leave as is with a passing loop.
H. Run-around Loop.
I. Industry: Currently Intercity Foods
J. Connecting track for times I want to see trains roll!
So the idea is to have a train made up at
A with the engine being able to run-round using the reverse loop
K. Once made up, all trains leave from point
L (why they leave from point L and not point M is a good question). I want them to leave from point L because of the longer run. I need to think of a good reason, maybe getting the staff can only be done from point L or something like that.
The first industry that may be shunted is
E, any empties can only be picked up on this leg. Next is
F however this can only be done on the return leg and the extra long siding adds extra time to the shunt - nice!
We then travel past the current loop and into
H. Here things can get interesting depending on what needs to be shunted. If the shunters were helpful back at
A, we should have our train blocked accordingly, however at times this may not be the case. If we don't need to shunt here, we simply run-round and place guards van on the rear, e.g. if we only had to shunt
E on this Pilot run. On our return we may have to shunt at
F, before proceeding back to
A via K.
The rectangle shows the 600mm benchwork. Separating the scene from the upper industries (
F and
E) from the lower ones (
H, C and
I) will be the challenge. Note this is not to scale. I think I can get some good running and shunting with the plan outlined. Your thoughts?