Over the last few weeks I have been busy laying out a few ideas and concepts. Lowering the height of the layout has been very positive as I can now sit down and enjoy the trains roll by.
I have also worked on getting away from the round and round feel which I had previously and caused me no end of grief no matter how much I changed the schematic - the round and round feel killed the enthusiasm after a short well.
To increase the length of the mainline, I have now a glorified loop of track which actually goes into a lower level with a few twists and turns. Basically the main line comes back onto itself. I have also moved staging to a lower level. Currently as things sit, I have one stub ended staging and still need to work on the other side. Both will be lower level and out the way so to speak.
Unfortunately this involves quite some steep inclines and declines to get to the lower levels given the space. So far, all locos have been able to negotiate the incline, but I am not sure how well a steam loco will go, not that I have any, but have to think about the future just in case.
Currently, I basically have a small station with three roads, Road 3 having a Goods Shed and a Silo, with the possibility of a small . The intention is to have some crosses or meets here, with the occasional RoadSide goods doing a shunt. It is also possible to have a list of trains that will run on a given day and have some of them cross and/or meet. This will be good when I have running sessions.
With this layout, I get maximum mainline run, can have some scenery, and can run a variety of locomotives. The question remains however, how will I handle the issues faced with stud-ended staging now underneath.
I have also worked on getting away from the round and round feel which I had previously and caused me no end of grief no matter how much I changed the schematic - the round and round feel killed the enthusiasm after a short well.
To increase the length of the mainline, I have now a glorified loop of track which actually goes into a lower level with a few twists and turns. Basically the main line comes back onto itself. I have also moved staging to a lower level. Currently as things sit, I have one stub ended staging and still need to work on the other side. Both will be lower level and out the way so to speak.
Unfortunately this involves quite some steep inclines and declines to get to the lower levels given the space. So far, all locos have been able to negotiate the incline, but I am not sure how well a steam loco will go, not that I have any, but have to think about the future just in case.
Currently, I basically have a small station with three roads, Road 3 having a Goods Shed and a Silo, with the possibility of a small . The intention is to have some crosses or meets here, with the occasional RoadSide goods doing a shunt. It is also possible to have a list of trains that will run on a given day and have some of them cross and/or meet. This will be good when I have running sessions.
With this layout, I get maximum mainline run, can have some scenery, and can run a variety of locomotives. The question remains however, how will I handle the issues faced with stud-ended staging now underneath.
